Telelect Digger Derrick Manual

Just NSN Parts, owned and operated by ASAP Semiconductor, supplies various parts 72549, 71940, 65616, 64798, 60713 from premium manufacturer Simon Telelect Inc.You can type in the NSN such as 705, 620, 522, 417, 055 into our user-friendly search engine to find the exact part you need. Each and every part is cross-referenced,. We carry owners manuals for most brands of bucket trucks, digger derricks and cranes. Below is a listing of some of the manuals we carry: Hi-Ranger; Teco; Holan; Reach All; Lift-All; Telsta; Telelect; Elliott Crane; To get you the specific manual for your unit, all that is needed is your: Unit model number; Serial number. Digger Derrick Load Charts—Terex DIGGER DERRICK OPERATOR FULLY RETRACTED 2ND SECTION EXTENDED 80 4.1 29.3 0 5.7 38.1 0 75 5.7 28.8 0 8.0 37.5 0 60 10.2 26.5 9210 9210 15.0 34.3 5860 5860 45 13.9 23.2 7140 7140 20.6 29.5 4360 3970 30 17.1 18.9 5850 5450 24.9 23.4 3530 2800.

1-64
OPERATION GUIDELINES
JIB INSTALLATION AND REMOVAL
The jib assembly, which consists of the jib mounting bracket and the jib, may be installed or removed as a
To install the jib in the boom tip, use the following procedures:
a.Attach the jib mounting bracket (1) to boom tip by aligning mounting holes in jib mounting bracket (1)
with mounting holes in boom tip. Secure in place with pin(s) (5).
Telelect
b.Remove pin (3) from jib mounting bracket (1) and slide jib (4) into jib mounting bracket (1). Secure in
2.To install as complete assembly:
a.Attach the jib (4) and jib mounting bracket (1) to boom tip by aligning holes in jib mounting bracket (1)
b.Secure in place with pins (5).
c.After installation, check the roller(s), sheaves, and angle indicator for ease of operation. Lubricate if
d.Route winch line to the jib sheave as depicted on the diagrams. Starting at the winch, follow A to B.
When installing the jib assembly check pins, rollers, sheaves, jib pivot points, jib extension points, and jib
rest, check for cracks, unusual wear, and missing or damaged hardware. If any discrepancies are found,
To remove the jib in the boom tip, use the following procedures:
a.Remove winch line from jib boom and jib mounting bracket (1).
c.Slide jib boom (4) clear of jib mounting bracket (1).
e.Support the jib mounting bracket (1) and remove pins (5).
g.Store the pins (5) on the jib mounting bracket (1).
h.Store jib mounting bracket (1) in a suitable storage area.
a.Remove winch line from jib boom (4) and jib mounting bracket (1).
b.Support the complete assembly and remove pins (5).
d.Store pins (5) on the jib mounting bracket (1).
e.Store complete assembly in suitable storage area.
When using jibs on this Digger Derrick, use the chart that is applicable to the jib
Parts

Telelect Digger Derrick Manual Diagram

operation. Do not use the Digger Derrick load capacity chart or handle poles with
Rope damage or excessive wear may result from improper routing of winch line.

Telelect Boom Parts

The diagrams illustrate the proper procedure for rope routing.